Forum Replies Created
-
AuthorPosts
-
vrt
Participantgot the rear section back from the acid dip. Now it’s time to start cutting the spot welds out
vrt
ParticipantBeen trying to remove the undercoating from the syncro floor and found it to be to difficult to remove. So sending out to get acid dipped
stay tunedvrt
Participantthe guys started to tear down the rear end
vrt
ParticipantYup I can’t wait to install it
vrt
Participantyes it is from F-town
vrt
Participantjust received my haldex standalone controller
vrt
Participantthe car has been at the shop for 1 month now and still no work. I guess they want to start on it when the snow hits and things get slow. Since this job isnt a quick one.
vrt
Participantyou got info [
]
vrt
ParticipantBeen waiting for the welder to cut the floor out and place the new section in
vrt
ParticipantI had made some bushing out of alum.
http://media.corrado-club.ca/albums/rob-car/Picture_001.sized.jpgvrt
ParticipantI’d like to see the end result of this hybrid.
vrt
Participante brake cables arrived
vrt
ParticipantAlso had a shifter housing shipped to me from UK that will work with the 6 speed mk4 internals but still for a mk2/3 frame
vrt
ParticipantFor the tranny I had a diff installed and modified the shifter forks
vrt
ParticipantMay I ask – what was to cost to ship the floor to the US?
-
AuthorPosts