Reply To: LD50’s syncro… attempt #2, now #3 – It moves ;)

Forums Project Cars (contains photos) LD50’s syncro… attempt #2, now #3 – It moves ;) Reply To: LD50’s syncro… attempt #2, now #3 – It moves ;)

#18180
LD50
Keymaster

So 2 of the 4 bolts fitted, I had to grind the other 2 nuts off. It wasn’t anythign I’d done wrong though, just 2 of the actual towbar holes needed tweaking by a few mm, re-welded nuts on and it all fitted nicely.

In the pics the sides are drooping a bit because I’ve not put on the plastic fittings which hold the sides aligned. REar quarter panel also hasn’t been properly welded yet, mig torch gave out halfway thru.

  • This reply was modified 7 years, 9 months ago by LD50.

My website | My Youtube channel (both mostly bike related)

V2 of the vwsyncro.co.uk forums

Site and hosting by Plus8.net
Firebeans crystal healing (new wordpress site) | Firebeans crystal healing (old site)