Corrado haldex

Forums Project Cars (contains photos) Corrado haldex

This topic contains 52 replies, has 6 voices, and was last updated by  vrt 5 years ago.

Viewing 15 posts - 1 through 15 (of 53 total)
  • Author
    Posts
  • #1387

    vrt
    Participant

    I have had this project in the works for a while and have collected most if not all the parts to covert the rear end to a syncro/haldex system.
    the list is as follows
    02m tranny
    DSS front custom axles
    peloquin diff
    TT diveshaft
    rear passat syncro system moded for haldex
    haldex unit
    moded rear axles
    Syncro boot
    golf syncro tank

    I will post pics of the parts that I have started to work on.
    By the end of the Month I will have the rear floor cut out to fit the new section.

    #7739

    vrt
    Participant

    100_0470.sized.jpg
    100_0469.sized.jpg
    100_0521.sized.jpg
    100_0479.sized.jpg
    100_0499.sized.jpg
    100_0502.sized.jpg

    #7740

    vrt
    Participant

    some parts I need to have custom made like the bushings for the passat rear beam as well as the fuel pump.
    100_0543.sized.jpg
    Picture_001.sized.jpg
    100_0581.sized.jpg

    I will try to answer any question that you may have.
    The main thread with most of the work and progress is on the Corrado forum
    http://www.corrado-club.ca/forum/viewtopic.php?t=12795&postdays=0&postorder=asc&start=0%5D

    #7742

    Chris S
    Moderator

    Did you get the that floor from Jman in Portland Oregon?

    #7743

    vrt
    Participant

    Yes I did. Why did you sell it to him?

    #7745

    Chris S
    Moderator

    Yes, I shipped it over to him last year. [:)]

    #7767

    vrt
    Participant

    May I ask – what was to cost to ship the floor to the US?

    #7768

    vrt
    Participant

    For the tranny I had a diff installed and modified the shifter forks
    100_0460.sized.jpg
    100_0442.sized.jpg

    #7769

    vrt
    Participant

    Also had a shifter housing shipped to me from UK that will work with the 6 speed mk4 internals but still for a mk2/3 frame
    100_0440.sized.jpg

    #7770

    Chris S
    Moderator

    quote:


    Originally posted by vrt

    May I ask – what was to cost to ship the floor to the US?


    I dont know exactly, as it went as part of a shipment I made to James

    but I can tell you it wasn’t cheap [:0]

    #7774

    vrt
    Participant

    e brake cables arrived
    100_0585.sized.jpg

    #7896

    vrt
    Participant

    Been waiting for the welder to cut the floor out and place the new section in

    #7953

    Vegard
    Member

    quote:


    Originally posted by vrt

    Also had a shifter housing shipped to me from UK that will work with the 6 speed mk4 internals but still for a mk2/3 frame
    100_0440.sized.jpg


    Do you have a part# for this one? It would solve a problem for me…

    #7955

    vrt
    Participant

    you got info [;)]

    #7997

    vrt
    Participant

    the car has been at the shop for 1 month now and still no work. I guess they want to start on it when the snow hits and things get slow. Since this job isnt a quick one.

Viewing 15 posts - 1 through 15 (of 53 total)

You must be logged in to reply to this topic.

V2 of the vwsyncro.co.uk forums

Site and hosting by Plus8.net